1. Third Priority Fire Protection Water
Pipeline Replacement Project
Monterey
Peninsula Engineers commenced construction of the final segment of the new
water pipeline located near Monterey Peninsula Country Club for the Third Priority
Fire Protection Water Pipeline Replacement Project. The remaining field work is scheduled for construction
in April.
2. Fourth Priority Fire Protection Water
Pipeline Replacement Project
E2 Consulting Engineers continued analysis of the hydraulic computer
model for the
3. 2006 Sewer Line Replacement Project
E2 Consulting Engineers consulted with District maintenance and
engineering staff and identified project elements to be included in the design
for the 2006 Sewer Line Replacement Project.
Construction documents will be ready for bidding in May.
4. Pump Station SCADA System Improvement Project
The SCADA (Supervisory Control and Data Acquisition) alarm
system is operational with the exception of pump station P-8 (Inn at
Reviewed: General
Manager: RA Date: 3/27/06 Agenda