D
I S T R I C T E N G I N E E R ‘ S R E P O R T
February 24, 2006
To: PBCSD Board of Directors
From:
Subject: Status
of Capital Improvement Program Projects
_________________________________________________________________________
1. Third Priority Fire Protection Water
Pipeline Replacement Project
Monterey
Peninsula Engineers commenced construction of the final segment of the new
water pipeline located near Monterey Peninsula Country Club for the Third Priority
Fire Protection Water Pipeline Replacement Project.
2. Fourth Priority Fire Protection Water
Pipeline Replacement Project
E2 Consulting Engineers updated the hydraulic computer model for the
3. 2006 Sewer Line Replacement Project
A recommendation to approve an agreement with E2 Consulting Engineers for
engineering services for the 2006 Sewer Line Replacement is included in Agenda
Item Number 11.
4. Pump Station SCADA System Improvement Project
The SCADA (Supervisory Control and Data Acquisition) system
has been integrated with the District local area computer network. The SCADA alarm system is operational and
will be used concurrently with the existing telemetry alarm system for six to
eight weeks. Tesco Controls scheduled a
factory test earlier this week for software programming that will integrate Forest
Lake Reservoir improvements with the District SCADA system as well as several
reclamation project locations including the 2.5 million water storage tank and
the Viscaino backup potable water pump station.
Reviewed:
General Manager: RA Date: 2/17/06
Agenda
Item No. 9